Home → Templates → Emergency lighting test record template
Templates

Emergency lighting test record template

Use this log to record what was tested, which fittings passed or failed, what action was taken and who verified the result. It is a working record for emergency escape lighting, not a substitute for the fire risk assessment, an appropriately designed system, manufacturer instructions or competent inspection. A completed row should let the next responsible person find the tested equipment and understand any remaining loss of escape-lighting coverage.

In England and Wales, Article 17 of the Regulatory Reform (Fire Safety) Order 2005 requires a suitable maintenance system for relevant fire safety facilities and equipment where necessary to safeguard people. The precise legal framework differs in Scotland and Northern Ireland. GOV.UK's office-and-shop fire risk assessment guidance describes typical daily visual checks, monthly function tests and annual full-discharge tests, with competent testing and records. The appropriate method and schedule for a particular system depend on its design, manufacturer guidance, current standard and fire risk assessment. Do not treat a generic form as a blanket statutory frequency for every building.

Copyable site and system header

FieldEnter details
Premises and address
Responsible person / dutyholder
Fire safety manager / record owner
System description and emergency-lighting zone
Asset register or drawing reference
System type, test facilities and manufacturer instructions
Fire risk assessment / maintenance plan reference
Competent service provider and contact
Normal test time / occupancy precautions
Location of previous logs and outstanding defects
Review date for this log and maintenance schedule

Before use: Give each luminaire, exit sign or relevant central component a stable asset ID and location. If the system has automatic self-testing, record how results are retrieved and verified. Ensure the schedule reflects the actual equipment and current fire strategy. A test key used on the wrong circuit can leave an apparently complete log while a fitting remains untested.

Copyable monthly function-test log

Date/timeZone and asset IDs testedMethod / test switchResult for each unitDefect or abnormal indicationTemporary safety measureAction owner and due dateTesterReviewed by / review date
Pass / Fail / Not tested with reason
Pass / Fail / Not tested with reason

For a large building, attach an asset-level sheet and put its reference in the row. Do not record “all passed” unless the test method actually covered each relevant unit. If an area was inaccessible, identify it and arrange a catch-up test; “not tested” is a valid factual status, but it is not a pass.

GOV.UK guidance describes a monthly function test as operating the test facility long enough to confirm each emergency lamp illuminates. It also advises testing at an appropriate time because systems may need to recharge after testing. Follow the system supplier's instructions and competent advice for the exact method. A short function test does not establish that a battery will provide its full designed duration.

Copyable annual duration and competent-service log

Test date/timeCompetent person / companyZone and asset IDsRequired design duration / basisObserved duration and resultBattery / charger / indicator findingsDefects and affected escape routeInterim control and responsible personRepair referenceRetest date and resultSign-off
Pass / Fail / Not tested

The GOV.UK guide describes a typical annual full-discharge test by a competent person and warns that batteries may need time to recharge after a full test. Plan the test so that required escape-lighting coverage is not casually lost during occupancy. Record the interim arrangement agreed by the responsible person if the premises would otherwise be occupied while the system cannot perform its safety function. Do not state a universal recharge period; confirm the equipment's actual characteristics.

The form should preserve the competent person's report reference rather than replace it. If a service company uses its own detailed sheet, cross-reference it here and retain both under the fire-safety records policy.

Copyable defect and repair tracker

Defect IDFound on / test rowExact fitting or zoneSafety impactInterim controlRepair ownerTarget dateWork done / evidenceRetest by and dateClosure decision
Open / Verified closed

Do not close a defect just because a replacement part was ordered. Record installation and a proportionate functional or duration retest, depending on what failed. If an exit route is affected, have the responsible person decide immediately whether occupancy, route use, temporary lighting or fire procedures need changing. A red cell on a dashboard is not an interim control.

How to use the template without creating false assurance

1. Check coverage against the asset register. Match test rows to installed units and zones. Account for new or removed fittings after building works. A log with no asset IDs cannot reliably show what was checked.

2. Record the test type. A monthly function check, annual duration test, routine visual check and remedial retest answer different questions. Put the type in the record rather than relying on a generic “test completed” tick box.

3. Capture exceptions. Record failures, missing tests, obscured signs, damaged fittings and abnormal indicators. Note the affected route or area, not only the room number. A failed remote storeroom fitting and a failed primary stairwell fitting can require different urgent decisions.

4. Protect the building while defects are open. Decide who assesses the fire-safety impact, who implements interim controls and who tells occupants or contractors if their route changes. Seek competent advice when coverage is uncertain. The form can document the decision; it cannot decide the building remains safe.

5. Verify repairs. Attach the service report, replacement details and retest outcome. The responsible person or delegate reviews closure and updates the building fire risk assessment or maintenance plan where the failure suggests a broader issue.

6. Review patterns. Repeated battery failures in one zone, missed monthly checks or recurring access problems may signal a maintenance or design issue. Bring them into the fire-safety review rather than simply filing each year's log.

Worked example

During a monthly function check, a caretaker finds that exit sign EL-17 at the rear stair does not illuminate when the test facility is operated. The row names EL-17, the test time and result. The caretaker reports the failure to the fire safety manager, who checks whether the stair remains an available escape route and arranges an interim control with competent advice. A contractor replaces a failed component. The service report is linked to defect EL-17, and the fitting is retested before the defect is marked verified closed. The annual duration test remains a separate future check; the repair's short function retest must not be labelled as a full-duration pass.

Common questions

Is a monthly tick enough? No. A useful record identifies what was tested, result, tester and defects. GOV.UK guidance calls a test log good practice and describes typical test methods, but the responsible person must maintain a suitable system under the applicable fire law.

Can a self-testing system replace this sheet? Its output can provide evidence if the system is correctly configured, reviewed and defects acted on. Record how results are retrieved, who reviews them, and the competent maintenance arrangement. Automatic test messages alone do not repair a failed fitting.

Does the template certify BS 5266 compliance? No. A current standard and competent design/maintenance assessment may be relevant, but this free form cannot certify installation or compliance with a copyrighted standard. Record the standard and system specification used by the competent person rather than reproducing a technical test method from a standard here.

Complys and related records

A product demonstration can show whether a user can store asset IDs, test dates, attachments and open repair actions. This template does not claim that Complys performs automatic emergency-lighting testing, BS certification or regulator sign-off. Use your fire risk assessment for premises-wide strategy and a corrective-action record for cross-system defect management; this template is the emergency-lighting test record.

Sources

Material claimPrimary sourceBoundary
Suitable maintenance of fire-safety facilities and equipment in England/WalesFire Safety Order 2005, article 17Different law in Scotland/NI; premises context matters
Typical monthly function and annual full-discharge checksGOV.UK offices and shops guideGuidance and system-specific method, not a universal form
Records and monthly/annual testing routinesGOV.UK small non-domestic premises guidePremises-specific fire assessment remains required