Plain-English, HSE-sourced guides to risk assessments and method statements — what they are, whether they're a legal requirement, who needs them, and how to write ones that pass review.
Start with the basics, or jump to what you need. Every guide is checked against HSE and legislation.gov.uk and links its sources.
RAMS stands for Risk Assessment and Method Statement — the two documents that show a job has been planned to be done safely. Here's what each one means, in plain English.
The honest answer: a risk assessment is required by law, a method statement generally isn't — but you'll almost always need both in practice. Here's exactly what UK law says.
Employers, the self-employed, contractors, subcontractors and principal contractors all rely on RAMS. Here's who needs them and who will ask for them before you get on site.
A risk assessment is one half of RAMS. Here's the difference between a standalone risk assessment and a full RAMS — and when you need each.
The two documents in RAMS do different jobs. A risk assessment identifies hazards and controls; a method statement sets out the safe sequence of work. Here's how they differ and work together.
How to write RAMS that pass review: work through HSE's risk-assessment steps, apply the hierarchy of control, then turn the controls into a clear method statement. A practical guide.
CDM 2015 never uses the word 'RAMS' — but it requires a construction phase plan and that contractors plan, manage and monitor their work. Here's exactly where RAMS fit.
A worked example of a construction RAMS, section by section, using a groundworks excavation. Shows what reviewers expect — with the caveat that HSE doesn't publish an official RAMS template.
The sections a complete RAMS document should contain — from project details and the risk assessment to the sequence of works, PPE, emergencies and sign-off. A practical checklist.
Answer a few questions about the job and Complys generates a complete, CDM-ready RAMS for your trade in minutes.