Health & safety

Write a professional RAMS in minutes — not hours

A RAMS — risk assessment and method statement — is what a principal contractor asks for before you set foot on site. Complys builds one tailored to your trade in a few minutes: you describe the job, review the draft, and it’s ready to sign off and send.

This guide covers the whole thing end to end — building it, editing it, signing it off on site, sharing it, reusing it, and checking a subcontractor’s RAMS too.

Guide · RAMS builder · ~9 min read
Trade-specific RAMS in minutes
On-site sign-off by QR code
Review subbies: pass / borderline / fail

What Complys builds for you

Every RAMS has two halves, and Complys writes both. The risk assessment lists the hazards of the task with the controls, PPE, legislation and emergency procedures that manage them. The method statement sets out how the work is done — the sequence of works, plant and equipment, and who’s responsible for what. Both are drafted from a template for your trade, then you edit anything before saving.

Why it helps
Instead of copying last job’s Word document and hoping it still fits, you get a fresh, job-specific RAMS that reads professionally and covers the right hazards for the actual task.

Build a RAMS, step by step

  1. 1

    Start from a template

    From Health & Safety → Build RAMS, pick a template for your trade. Complys shows the ones matched to your sector first. You can also start from one of your own saved templates.

    What you’ll see: Templates matched to your trade and sector, or the option to see all templates.
  2. 2

    Fill in the job details

    Add the document title, project or site name, client name and site address, and pick the site type (domestic, commercial, industrial, roadside/highway, woodland, and so on). These print on the cover sheet.

    What you’ll see: These become the cover of your PDF.
  3. 3

    Add the site context

    Record the parts that matter for compliance: a separate principal contractor under CDM 2015 if there is one; infrastructure work such as Network Rail (with the ARC cover sheet); your first-aid arrangements and qualified first-aider; and the site team and supervisor named in the RAMS.

  4. 4

    Describe the activity and generate

    Write what the work involves in plain terms and generate. Complys drafts the full risk assessment and method statement from your description. Generation uses credits — you see the cost before you confirm.

    What you’ll see: A confirmation showing the credit cost and your balance before and after.
  5. 5

    Review the risk assessment

    Check the hazards, PPE required, legislation, emergency procedures and supervisor requirements. Click any part to edit it — nothing is locked.

  6. 6

    Review the method statement

    Check the description of works, plant & equipment, PPE, legislation and safety responsibilities, edit as needed, and save. Your RAMS is now in your library as a professional PDF.

You own the final document
Complys drafts a strong starting point, but you know the job. Always review and adjust the generated RAMS so it reflects the real hazards and method on your site — you remain responsible for its accuracy.

After it's saved

  1. 1

    Attach supporting documents

    Add COSHH sheets, plant certificates, insurances or drawings so the whole pack travels together.

    What you’ll see: Prompted right after saving: “Attach supporting documents now?”
  2. 2

    Get your team to sign off on site

    Workers sign off the RAMS via a QR code or sign-off link, so you have a record that the briefing happened before work started.

    What you’ll see: A sign-off QR code and per-worker signatures stored on the document.
  3. 3

    Share it with the client or principal contractor

    Send the RAMS by email or a share link straight from the document. If they come back with comments, use Apply feedback to revise and reissue.

  4. 4

    Link it to a project, or build a pack

    Attach the RAMS to a project, or promote it into a RAMS pack with a reusable cover sheet (including Network Rail ARC format) when you’re submitting several documents together.

  5. 5

    Save it as a template

    Turn a finished RAMS into your own template so the next similar job starts 90% done.

Check a subcontractor's RAMS

If you take RAMS in from subbies, Complys reviews them for you. Sub-RAMS Check reads a subcontractor’s RAMS and returns a clear Pass, Borderline or Fail verdict with specific findings — so you know what’s missing before you accept it. And Modernise a RAMS rewrites a dated or weak RAMS into the gold-standard format.

Pass / Borderline / Fail

A quick, consistent verdict on any incoming RAMS, with the specific gaps called out so you can send it back with clear asks.

Modernise old RAMS

Rewrite a tired RAMS into a clean, professional format without starting from a blank page.

Why trades and contractors use it

Win work faster

Turn around a professional RAMS the same day a principal contractor asks, instead of losing days to paperwork.

Right hazards, every time

Trade-specific templates mean the RA covers what the job actually involves, not a generic copy-paste.

Proof of briefing

On-site QR sign-off records who was briefed, stored with the document for audits and incidents.

Control your supply chain

Sub-RAMS Check gives you a fast, consistent way to vet the RAMS you receive from subcontractors.

Questions people ask

What is a RAMS?
A RAMS is a Risk Assessment and Method Statement: the risk assessment identifies the hazards of a task and the controls that reduce them, and the method statement sets out how the work will be carried out safely, step by step. Principal contractors usually ask for one before you start on site.
How long does it take?
A few minutes. You pick a template for your trade, add the job details and describe the activity, and Complys drafts both the risk assessment and the method statement for you to review and edit before saving.
Can I edit what's generated?
Yes — everything. Hazards, PPE, legislation, emergency procedures, method steps, plant and equipment and responsibilities are all editable before you save, so the final document reflects your actual job. You remain responsible for its accuracy.
Does it handle CDM 2015 and principal contractors?
Yes. You can record a separate principal contractor for the site, add site supervisor and first-aider details, and cover infrastructure work such as Network Rail (ARC cover sheet format).
Can I check a subcontractor's RAMS?
Yes. Sub-RAMS Check reviews a subbie's RAMS and returns a Pass, Borderline or Fail verdict with specific findings. You can also modernise an existing RAMS by rewriting it into the gold-standard format.
How is my team's sign-off recorded?
Each worker signs off the RAMS — on site via a QR code or a sign-off link — and the signatures are stored with the document, so you can prove the briefing happened.

Build your next RAMS in minutes

Pick your trade, describe the job and get a professional risk assessment and method statement ready to sign off. Start free.

No card required · Free plan available · UK-built