Every construction project needs a construction phase plan. Generate one that meets CDM 2015 in minutes, tailored to your project, or modernise the plan you already use.

What a construction phase plan must cover

Regulation 12 of CDM 2015 requires a construction phase plan for every project, prepared before work starts. Complys builds it to the structure set out in HSG150, proportionate to the job.

  1. 1
    Describe the project

    The project, its programme, the client, principal designer and principal contractor, and the key dates are recorded.

  2. 2
    Set the management arrangements

    Roles and responsibilities, health and safety aims, induction, communication and cooperation, and how the plan is monitored and reviewed.

  3. 3
    Set the site rules

    The rules everyone on site must follow, from sign-in and PPE to permits and restricted areas.

  4. 4
    Control the significant risks

    The arrangements for controlling the significant health and safety risks of the work, with the control measures for each.

  5. 5
    Welfare and emergencies

    Welfare facilities, first aid, and the emergency procedures including fire, evacuation and incident reporting.

Construction phase plans โ€” FAQs

What is a construction phase plan?

A construction phase plan (CPP) is the document required by regulation 12 of the Construction (Design and Management) Regulations 2015 for every construction project. It sets out the health and safety arrangements, site rules and specific measures for controlling the significant risks during the construction phase.

Who is responsible for the construction phase plan?

On projects with more than one contractor the principal contractor draws up the plan. On a single-contractor project the contractor is responsible. It must be prepared before the construction phase begins and kept up to date as the work proceeds.

Does every project need one?

Yes. CDM 2015 requires a construction phase plan for every construction project, however small. The plan should be proportionate to the size and risk of the work: a short domestic job needs a simple plan, a large multi-contractor project needs a detailed one.

Can Complys build one for a specific job like Whitecross Farm?

Yes. You give the project details and Complys produces a CPP tailored to that job, covering the management arrangements, site rules, the significant risks and their controls, welfare and emergency procedures, ready to issue before work starts.

Have your construction phase plan ready before work starts